Monday, 23 April 2007

Tutorial Drawing Exercises

Finally, the tutorial drawing exercises. Apologies for the wait. Better late then never!

Week 5


Roof Panel Detail
Important elements:
* The joining of the concrete wall panel to the steel sheet panel with galvanised fixings
* The gap between the concrete wall panel and the steel sheet panel
* The positioning of the zincalume flashing
* The timber fixing blocks at given centers
* The waterproof plywood backing supporting the folded aluminium capping
* The distance between the top of the steel sheet panel and the top of the parapet
* The distance between the top of the steel sheet panel and the first galvanised fixing
* The varying distance of the top of the parapet and the zincalume flashing


Box Gutter Section
Important elements:
* The fixing of timber battens to the underside of spandek
* The fixing bracket to the studs
* The positioning of the fascia gutter, leading down to the box gutter, and hence the downpipe beyond
* The positioning of the purlins around the box gutter


Gutter Section (2) Detail
Important elements:
* All the elements learned in Gutter Section (1)
* The method of joining the concrete wall panel to the roofing with 'fyrechek'
* The positioning of the PVC downpipe and spreader to the lower roof
* The apron flashing in between the lower roofing and the PVC downpipe
* The method of joining the concrete wall panel to the colorbond wall cladding with top hat sections


Gutter Section (1) Detail
Important elements:
* The gap between the concrete wall panel and the 1/2 round gutter
* The insulation between the edge of the purlin and the colorbond fixing, and above the concrete panel
* The position of the round gutter under the edge of the roofing


Week 4 - Portal Frame Warehouse/Office Section
Important elements:
* All the elements learned in Weeks 2 & 3
* The UB floor beam and concrete slab relationship as the office floor,
* The use of flashing between the vertical corrugated cladding and the pitched corrugated metal roofing
* The use of capping and flashing over structural members


Week 3 - Section B
This drawing has the same important elements as 'Section A', however the importance here is understanding the relationships of those elements in a perpendicularly oppisite sectional view.


Week 2 - Section A
Important elements:
* The joining relationship between the stanchion, haunching and rafter beam (knee joint area)
* The area at and above the joining of the two rafters (apex)
* The 'C' purlins that are supported by the rafters and support the roofing
* The tilt-up concrete panel, custom orb cladding and stanchion relationship
* The 'C' girts placed in between the cladding and stanchion, above the concrete panel
* The box gutter above the top 'C' girt and adjacent to the end 'C' purlin

No comments: